Skip to content

Re: London Bridge Station Works – Revised Dates

16/11/2012

The works planned for this weekend (Saturday 17 November – Sunday 18 November 2012) at London Bridge have been cancelled and so the taxi rank in the station will be available and will operate as normal.
 
Some closures of the station are still planned as part of the ongoing London Bridge Quarter and station works and the dates of these are now:
 
·         Saturday 24 November – Sunday 25 November 2012
·         Saturday 1 December – Sunday 2 December 2012
·         Saturday 15 December – Sunday 16 December 2012
 
Taxi Arrangements:
During these times a marshalled temporary taxi rank will be in operation in Tooley Street. 
 
The head of the taxi rank will be in the bay in Tooley Street, outside of the station and to the west of the London Dungeon. This bay will be for 3 taxis and the taxi rank opposite More London will be extended to 6 spaces. The More London taxi rank and the loading bays between More London and the station will be used as a feeder rank.
 
Traffic marshals will be present at the temporary rank and drivers should follow the directions of the marshals.
 
Further information about the London Bridge works can be found on the Transport for London website.
 
Transport for London – London Taxi and Private Hire  

Advertisements
No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: